  • Technical process of blister packaging machine 1. PVC preheating Start the machine for heating. Close the upper and lower heating plates, and heat the PVC plastic sheet between the upper heating plate and the lower heating plate. After preheating, under the action of traction, it enters the blister forming mold. The upper molding die for blister molding is fixed, and the lower molding die rises to the upper limit under the action of the cam and presses the PVC plastic sheet hard. At this time, the air valve is opened, and the compressed air passing through the filter pressure reducing valve enters the cavity of the lower molding die through the upper molding die, and the PVC plastic sheet is formed by positive pressure. 2. Feed After forming the PVC plastic sheet into a certain shape, the feeder will transport the packaged material into the blister. Specially shaped materials are manually fed. It is equipped with a photo inspection system that can automatically remove debris from

    2020.07.20

    Read More
  • Replacement of the dosing plate and the filling rod of the automatic capsule filling machine 1. Loosen the fastening screw to raise the powder hopper with spring force; 2. Use a vacuum cleaner to remove the remaining powder in the medicine pool ring; 3. Rotate the main motor with the handle to make the punch seat plate in the highest position; 4. Loosen and remove the cap nut, turn the knob clockwise to raise the pressure plate and the filling holder and lift it off; 5. Remove the small pressure plate screw with the long hole under the holder, and remove the filling rod. After replacing the filling rod, press on the small pressure plate and tighten the screws for installation; 6. First loosen the screws on the barrier plate and pull out the barrier plate upwards, unscrew the two fastening screws at both ends of the powder ring cover, rotate the main motor with the handle correspondingly, loosen the four fastening screws that fix the powder ring, and connect the powder ring to the

    2020.07.18

    Read More
  • Precautions for packaging and packaging of blister packaging equipment 1. The inspector must check the whole machine for sheet metal inspection for obvious scratches, corners, burrs, and polished wires that have not been treated in place; 2. Confirm the electrical configuration of the equipment, confirm whether the voltage of the equipment is consistent with the order form, and check whether the electrical box and line trachea are clean; 3. Confirm whether the information on the nameplate is correct, whether the pasting mark is in the correct position, and confirm whether the tool box accessories and the mold are complete; 4. Test machine, whether there is abnormal noise and noise when the machine is running, confirm whether the various stations work normally during the machine operation, whether there is obvious swing, and whether the work is normal when the material is running, whether there is jamming (15-40 multi-speed operation) , Check whether the sample tested by the mold is

    2020.07.17

    Read More
  • Maintenance and cleaning of semi-automatic capsule filling machine​ 1. When the machine is in normal operation for a long time, the parts directly in contact with the powder should be cleaned regularly or according to the operation situation. When the drug type is changed or the downtime is long (generally more than three months), it must be thoroughly cleaned and detoxified. To work properly; 2. The transmission mechanism at the lower part of the machine frame panel should deal with oil pollution every 500 hours of operation, check the wear and tear, and confirm that there is no abnormal situation before adding lubricant to continue operation; 3. The filter of the vacuum system should be cleaned every 200 hours of operation; after 1500 hours of operation, the #100 vacuum pump oil must be replaced. 4. Lubrication of the machine (1) The joint bearings on the connecting rods on the lower part of the machine are filled with lubricating oil every 200 hours of operation; (over 90# oil

    2020.07.16

    Read More
  • Start-up operation of aluminum-plastic blister packaging machine 1. Connect the power supply according to the electrical schematic diagram and the safety electricity regulations, start the machine as shown on the operation panel, and observe whether the rotation direction of the motor is the same as the arrow, otherwise the wire change is corrected (note the grounding). 2. Connect the inlet, outlet and air inlet valves as shown on the front plate of the machine base, and connect the pneumatic pump motor to the electrical control circuit of the machine (if the power of the air pump motor is greater than 4KW, it should be equipped with a control power supply). 3. Turn on the heating parts and set the temperature: heat seal around 160℃, heat up and down around 100℃. For the adjustment method, see the instructions on the touch screen. The exact temperature is related to the working speed, the quality of the plastic sheet, the temperature and other factors, so it should be used in produc

    2020.07.15

    Read More
  • Method for replacing upper and lower modules of automatic capsule filling machine Loosen the fastening screws of the upper cover of the turntable to remove the upper cover and then loosen the fastening screws of the upper and lower modules to remove the upper and lower modules. Then install and replace the lower module of another specification. Align the two positioning holes of the lower module with the two pins of the T-axis and tighten the upper screw. Next, install the upper module. The concentricity of each pair of upper and lower module holes must be Correct at the eighth station, insert the module debugging rods into the two diagonal die holes on the left and right of the module to correct the concentricity of the upper and lower module die holes, and then tighten the screws to ensure that the debugging rods are in the upper and lower die holes Flexible in rotation.

    2020.07.13

    Read More
  • Working procedure of blister packaging machine 1.According to the electronic safety,connecting to the power supper,press the button for main motor to see if it is run nomally. 2.Cooling water:According to the scutcheon on the machine ,connect the cooling water to see if the current is running smoothly. 3.Air compressor:Open the air compressor and you can use the air pump until the air pressure is reached at 0.2-0.4MPA. 4.Add the oil:Add the lubricating oil to cam box and gear-box. Plus :2/3 of the oil box will be enough. 5.Adjust nut paper ,put the PVC on the bearing and lock it,Then draw the PVC to the traction nip and fix it.The position of the PVC should be conform to the orbit of the machine and keep average on the both sides.

    2020.07.11

    Read More
  • Installation and use steps of industrial chiller 1. Open the package and check whether the machine is intact and the accessories are complete. 2. Connect the inlet and outlet pipes, install a drain valve or a blocking cap, open the top water cover, use pure water or tap water to inject fresh water into the storage tank, the water level is subject to the flooding return port, the cooling coil must be fully immersed in the water port, when adding water At the same time observe the water level and slowly add water, taking care not to let the water overflow. 3. After filling the water, please inject a small amount of clean water into the ring groove. The device uses a water seal to isolate dust to prevent pollution of circulating water. When using in cold northern areas, it should be filled with non-corrosive antifreeze. It is recommended to use 30 % Concentration of ethylene glycol solution. 4. Connect the power cord and press the ON/OFF key switch. (It is strictly forbidden to start w

    2020.07.09

    Read More
  • Precautions for operation of semi-automatic capsule filling machine 1. Arrange professional full-time staff to operate and maintain. The operator must have the appropriate quality, the use of methods and strict compliance with safety regulations after a basic understanding of the operating instructions, and do routine maintenance work. 2. Please read the operating instructions carefully before using the device and pay attention to warning signs affixed to the machine. 3. Do not install the equipment in the heat, humidity, vibration, strong, easy to make a collision or flammable place. 4. Before using the device according to the machine ground signs indicating access to the ground. 5. To confirm the voltage of power supply must meet the specifications of the machine and kept within safe limits. 6. Keep the device electrical box door closed to prevent moisture or dust particles flying into the cause short circuit, and the timing of the electrical box in the dust to clean up (Must b

    2020.07.06

    Read More
  • Precautions for operation of capsule polishing machine Before power on, rotate the principal shaft of the motor with hand to check there is no phenomenon of seizing-up. Check every fastener to see whether it is tightened. Insert the power plug of the vacuum cleaner in the socket under the machine body; connect the hose of the cleaner and the cleaner starts working first. Then switch on the power, pour a small amount of medicine, and regulate the speed-regulating knob to change the rotational speed till the clean degree of the medicine surface reaches a satisfactory effect. The rotational speed is inversely proportional to the clean degree. In order to recover surplus medicinal powder, we suggest that the medicine should be sifted with a big mesh sifter before it is polished.

    2020.07.03

    Read More
  • Total 61 pages  Go to Page
  • Go
  info@hanyoo.net
  0086 25 5621 6295
  0086 25 5621 6289
  0086 187 5183 8183
  No. 380 Sanqiaogeng, Gaochun District,
Nanjing, China. 211300

Quick Link

Products

Leave a Message
Contact us

QR Code

Capsule Filling Machine, Blister Packing Machine
Copyright  2016 Jiangsu Hanyoo Pharmatech Co., Ltd. All rights reserved. Capsule Filling Machine, Blister Packing Machine, Cartoning Machine Professional Manufacture.