Views: 1 Author: Site Editor Publish Time: 2021-09-10 Origin: Site
Blanking die adjustment of bubble cover machine
Adjust the blanking die
First adjust the punching box, so that the punching position is roughly accurate.
When adjusting the die pressure, loosen the pressure plate screw first and adjust it left and right to ensure that the lower die is aligned with the plate position and the gap is uniform.
After all molds are adjusted properly, empty operation can be carried out, and the bubble cover can be produced properly.
After production, press the screen stop button to turn off the power, and then close the inlet valve and water inlet valve to end production.